Radar Foncier
Radar Soumission
‹ Côte Saint-Luc rules

Côte Saint-Luc

Can you add a basement apartment in Côte Saint-Luc?

A dwelling unit is allowed in the basement if the basement counts as a full storey for the use class, if the total number of units allowed in the zone (RU, RB) is not exceeded and if the required parking is provided.

Permit required

A zone, a heritage area or a shoreline can have its own standards: with your address, the Radar reads your zone's grid and tells you what applies to your property.

The rules, in short

  • A dwelling unit is allowed in the basement if the basement counts as a full storey for the use class, if the total number of units allowed in the zone (RU, RB) is not exceeded and if the required parking is provided. (art. 4-8)

Summary by Radar Foncier, in our own words: the official French text of the by-law, linked above, prevails.

Applying in Côte Saint-Luc

  • Processing time: Up to 30 days for minor work (pool, shed, interior renovations) once the application is complete; currently longer because of high volume
  • Cost: Outdoor structures (balconies, fences, garden sheds, pools): $75 per application + $11 per $1,000 of work, $150 minimum, plus a $2,500 to $5,000 deposit for damage to City property
  • Urban planning department: 514 485-6800
  • Permits on the municipality's website

Basement apartment elsewhere: Dorval, Gatineau, Montreal, Sherbrooke, Vaudreuil-Dorion, Westmount.

Version française de cette page

Source: Zoning By-law 2217 of the City of Côte Saint-Luc (unofficial version published by the City), French version, checked on October 22, 2026. Plain-English summary: the official French text prevails, and a by-law can change. Confirm with the Côte Saint-Luc urban planning department before buying materials. Radar Foncier is an independent service, not affiliated with the municipality.

Radar Foncier in English. Permits and rules for Québec homeowners; the full site and the reports are in French. Version française

AccueilExplore the map