Can you add a basement apartment in Sherbrooke?
An integrated additional dwelling unit is allowed in a detached single-family house inside the urban perimeter, within the house or an extension; one of the units must be the principal residence of the owner or an occupant.
Permit depends on the caseA zone, a heritage area or a shoreline can have its own standards: with your address, the Radar reads your zone's grid and tells you what applies to your property.
The rules, in short
- An integrated additional dwelling unit is allowed in a detached single-family house inside the urban perimeter, within the house or an extension; one of the units must be the principal residence of the owner or an occupant. (art. 5.3.12, 1) to 3))
- It may occupy every level, basement included, up to 35% of the total floor area (basement included, garage excluded). (art. 5.3.12, 8))
- Only one door on the main façade; the additional unit's door goes on the sides or at the rear (side balcony of 5 m² max.); a separate civic number; a single water and sewer connection. (art. 5.3.12, 4) to 7))
- Complementary (intergenerational) unit: detached single-family house, at most 2 bedrooms and 35% of the floor area, an inside connection that must not be lockable, a single door on the façade, not entirely in the basement unless one side or the rear is fully above grade. (art. 5.3.10)
- Detached additional unit (in a separate building): possible with a detached single-family or two-family house, on a serviced lot of at least 450 m², at most 70 m² of floor area, after council approval (conditional use). (art. 5.3.13)
Summary by Radar Foncier, in our own words: the official French text of the by-law, linked above, prevails.
Applying in Sherbrooke
- Processing time: Permit issued in 30 minutes at an in-person appointment if the documents are complete (pool, accessory building); no processing time published for other methods
- Cost: Accessory building (residential): $76.25 for $0 to $5,000 of work, plus $2.50 per additional $1,000; other permits and certificates under By-law 1202
- Urban planning department: Borough inspectors' offices (e.g. Des Nations borough, 731 Galt Street West, suite 200: 819 821-5905)
- Permits on the municipality's website
Other projects in Sherbrooke
Basement apartment elsewhere: Côte Saint-Luc, Dorval, Gatineau, Montreal, Vaudreuil-Dorion, Westmount.
Version française de cette page
Source: Zoning and Subdivision By-law 1200 (administrative version up to March 10, 2026), French version, checked on October 22, 2026. Plain-English summary: the official French text prevails, and a by-law can change. Confirm with the Sherbrooke urban planning department before buying materials. Radar Foncier is an independent service, not affiliated with the municipality.
Radar Foncier in English. Permits and rules for Québec homeowners; the full site and the reports are in French. Version française